With presence of Morteza Bank president consultant and MD of free zones of Iran and some high-ranked peoples, F18 Jacket has been loaded out in PFC’s offshore yard in Qeshm Island.

The jackets were loaded-out onto the Tondgoyan 105 launch barge, using the push/pull skidding system.

F18 Jacket & Topside which are fully designed, procured & fabricated by PFC’s experts, will be installed in the Foroozan Oil Field (common fields between Iran and Saudi Arabia) between Oct. & Nov. 2017 including infield subsea pipelines & Subsea Cables.

This project has been commenced on April, 2012, with fabrication of a 1,100 tons Jacket & 56 m height and a 1,000 tons unmanned wellhead platform with 24 x 25 m dimension, fully equipped with high technology system.

F18 platform is a four-legged structure with 12 wells in water depth of 49 m and is designed for 12,000 b/d crude oil production.

 

 